Electric Highway Tasmania - Swansea
0.1 km · Electric Highway Tasmania
Noyes St
CCS2, 50 kW; CHAdeMO, 50 kW; Type 2 (socket), 22 kW
Cost as listed on Open Charge Map: “25c/kWh + 25c/min”. It may have changed.
Listed by Open Charge Map, last verified 15 Jul 2023. Its newest record is more than a year old: confirm with the operator.
50kW
fastest plug