Pay at the site
Best Western Pemberton
1.6 km
Best Western Pemberton, 66 Brockman Street
Three Phase 5-Pin (AS/NZ 3123), 11 kW
Cost as listed on Open Charge Map: “$20”. It may have changed.
Listed by Open Charge Map, last verified 9 Dec 2021. Its newest record is more than a year old: confirm with the operator.
11kW
fastest plug