App or membership needed
Warrick Grove Mall
6.7 km · Chargefox
Beach at Erindale
2 × CCS2, 150 kW; Type 2 (socket), 22 kW
Cost as listed on Open Charge Map: “$0.69 per kWh”. It may have changed.
Listed by Open Charge Map, last verified 9 Aug 2025. Its newest record is more than a year old: confirm with the operator.
150kW
fastest plug