Granville Civic Centre
6.3 km
1 Jones Street
Three Phase 5-Pin (AS/NZ 3123), 18 kW; 4 × Type I (AS 3112), 7 kW
Price: not published by the sources.
Listed by Open Charge Map, last verified 27 Nov 2021. Its newest record is more than a year old: confirm with the operator.
18kW
fastest plug