App or membership needed
Eli Waters Shopping Centre
5.1 km · Evie Networks
2 Ibis Boulevard
4 × CCS2, 150 kW
Cost as listed on Open Charge Map: “0.68”. It may have changed.
Listed by Open Charge Map, last verified 29 Jul 2024. Its newest record is more than a year old: confirm with the operator.
150kW
fastest plug