Pay at the site
Barbagallo Raceway
4.1 km · The business at the site
Wattle Avenue East
2 × Type I (AS 3112), 3.6 kW; 2 × Three Phase 5-Pin (AS/NZ 3123), 14.4 kW; Three Phase 5-Pin (AS/NZ 3123), 22 kW
Cost as listed on Open Charge Map: “Pay for parking”. It may have changed.
Listed by Open Charge Map, last verified 28 Jul 2023. Its newest record is more than a year old: confirm with the operator.
22kW
fastest plug