Pay at the site
Bicheno Town Centre
4.8 km
Opposite 39 Foster Street
CCS2, 50 kW; CHAdeMO, 50 kW; Type 2 (socket), 22 kW
Cost as listed on Open Charge Map: “See https://electrona.au/evc/bchno/bchno-001.html”. It may have changed.
Listed by Open Charge Map, last verified 22 Jun 2025. Its newest record is more than a year old: confirm with the operator.
50kW
fastest plug