App or membership needed
Webbe St Carpark
1.1 km · Evie Networks
56B Edward St
2 × CCS2, 50 kW; 2 × CHAdeMO, 50 kW
Cost as listed on Open Charge Map: “50c per kWh energy consumed”. It may have changed.
Listed by Open Charge Map, last verified 12 Jul 2023. Its newest record is more than a year old: confirm with the operator.
50kW
fastest plug