App or membership needed
Port Headland (WA EV Network)
3.0 km · Chargefox
3 Sutherland Road
2 × CCS2, 150 kW; Type 2 (socket), 22 kW
Cost as listed on Open Charge Map: “$0.60 per kWh for fst DC, $0.35 per kWh for slow AC”. It may have changed.
Listed by Open Charge Map, last verified 29 Jan 2025. Its newest record is more than a year old: confirm with the operator.
150kW
fastest plug