Pay at the site
RAA Ceduna
5.4 km · Chargefox
McKenzie Street
2 × CCS2, 150 kW
Cost as listed on Open Charge Map: “0.59 - 0.68 AUD kWh”. It may have changed.
Listed by Open Charge Map, last verified 1 Mar 2024. Its newest record is more than a year old: confirm with the operator.
150kW
fastest plug