Pay at the site
RAA Charge Brickworks
6.3 km · Chargefox
2 Ashwin Parade
2 × CCS2, 200 kW; Type 2 (socket), 7 kW; CHAdeMO, 200 kW
Cost as listed on Open Charge Map: “DC is Evening peak 68c kWh (5:00pm to 10:00pm), Standard 59c kWh (all other times), AC is Evening peak 32c kWh (5:00pm to 10:00pm), Standard 25c kWh (all other times)”. It may have changed.
Listed by Open Charge Map, last verified 14 Oct 2024. Its newest record is more than a year old: confirm with the operator.
200kW
fastest plug