App or membership needed
Orana McDonalds
4.5 km · Chargefox
475 Albany Highway
2 × Type 2 (socket), 22 kW
Cost as listed on Open Charge Map: “$0.25 per kWh”. It may have changed.
Listed by Open Charge Map, last verified 6 Jun 2021. Its newest record is more than a year old: confirm with the operator.
22kW
fastest plug